Bolivar Dam Abutment Restoration

Mason Cement is proud to have completed the Bolivar Dam Restoration Project for the Army Corps of Engineers. Included was the construction of a new monument to receive the Historic Plaque first installed nearly 80 years ago. Also included was new sidewalks, curbs, decorative concrete and decorative bollard installation.

 

911th Airlift Wing Construct Munitions Maintenance & Inspection Facility

2018 Brings us back to the 911 Airlift Facility. We will install footings, concrete walls, floor and site concrete on this project.

 

Massillon Track and Field

We are proud to have been selected to join the team to build this new facility for Massillon City Schools. Included is over 1,200 feet of trench drain, sports equipment installation, and 1 1/2 acres of bleacher pads and sidewalks. Most of this completed in what seemed like the rainiest fall ever!

911th Airlift Wing

Mason Cement was chosen to install concrete for a new building at this Pittsburg facility. This will be our second project at the 911 Airlift. Although challenging at times, we are proud to work on these important projects. Sorry, no pictures. Its Top Secret!!

Radiant Life Church

This new place of worship consisted of foundations, 20,000+ sf of floor and sitework. I would have to say that building a new church is one of our most rewarding type of projects.

Merry Weather Foam

This project consisted of 2 factory additions, the installation of 2 new loading docks, heated sidewalks and a new concrete parking lot.

Jesuit Retreat House

Mason Cement was chosen to team up on an addition to one of the oldest Jesuit facilities in the country. Included was footing under-pinning, building, site, and decorative concrete.

Atwood Lake Welcome Center

This project consisted of footings, floor, decorative concrete and all site concrete.

 

Holiday Inn Precast

Mason Cement installed precast plank for this multi-story addition.